Getting Started

Default solution folder, feel free to edit or delete it.

Prepare list for machine installation
There are 7 parts in this article! 1. Water A: Cutting water in.  1/2"  to the water supply(Above 40PSI). Need a ball valve for A. It is ...
Fri, 5 Mar, 2021 at 1:18 PM
Gantry style waterjet machine pre-install
Customers are welcomed to do pre-installation for the machine.  
Thu, 28 Sep, 2017 at 4:16 PM
A&V Waterjet Machine 5 Days Installation and Training Schedule
This is based on the readiness of power source (480V/3Phase/100AMP), inlet water source (Consistent 40 - 120 PSI, ideally deionized/purified water) and air ...
Mon, 23 Mar, 2015 at 3:27 PM
Air chiller installation instruction
1. Prepare a 4 conductor wire. 2. For 3 of the conductors (U,V,W), connect one side to the air chiller and the other side connect to the pump. ...
Thu, 12 Mar, 2015 at 3:07 PM
A&V Pump Start AMP | 50 HP Pump - 100 AMP | 100 HP Pump - 150 AMP
Mon, 9 Mar, 2015 at 10:50 PM
A&V Waterjet Cutting Machines floor plan
Attached are the floor plans for all our machines. Please have a look and let me know if there is any problems. The following link is for some sample p...
Fri, 19 Jul, 2019 at 3:12 PM
4 * 4 machine packing list
0404 Packing list
Mon, 25 Sep, 2017 at 2:41 PM
10*6 packing list
1006 packing list
Mon, 25 Sep, 2017 at 2:48 PM
6*4 machine packing list
0604 Packing list
Mon, 25 Sep, 2017 at 2:51 PM
Air chiller packing list
Thu, 9 Apr, 2015 at 3:32 PM