Getting Started
Default solution folder, feel free to edit or delete it.
There are 7 parts in this article! 1. Water A: Cutting water in. 1/2" to the water supply(Above 40PSI). Need a ball valve for A. It is ...
Fri, 5 Mar, 2021 at 1:18 PM
Customers are welcomed to do pre-installation for the machine.
Thu, 28 Sep, 2017 at 4:16 PM
This is based on the readiness of power source (480V/3Phase/100AMP), inlet water source (Consistent 40 - 120 PSI, ideally deionized/purified water) and air ...
Mon, 23 Mar, 2015 at 3:27 PM
1. Prepare a 4
conductor wire.
2. For 3 of the
conductors (U,V,W), connect one side to the air chiller and the other side
connect to the pump.
...
Thu, 12 Mar, 2015 at 3:07 PM
Attached are the floor plans for all our machines. Please have a look and let me know if there is any problems. The following link is for some sample p...
Fri, 19 Jul, 2019 at 3:12 PM